Where Virtual Commissioning Is Typically Used
Virtual commissioning is typically used by teams responsible for
automation control development and site commissioning, where
reducing live commissioning time is a priority.
System Integrators
Integration teams developing PLC and control programs for
automated systems who need to validate logic before on-site
commissioning begins.
Machine Builders & OEMs
Equipment manufacturers who need to test machine control
behaviour before delivery — reducing factory acceptance
test time and customer site commissioning effort.
Manufacturers
Production teams commissioning new automated lines or
integrating new equipment into existing systems, where
minimising downtime and rework is critical.
What APEXIZ Can Support
- Building virtual machine and system models for control validation
- Connecting PLC programs to simulation for pre-commissioning testing
- Validating sequence logic, interlocks, and error handling behaviour
- Testing system behaviour under fault conditions and edge cases
- Supporting control teams in iterating on logic before site work begins
Typical deliverables may include:
- Virtual machine or system model for control validation
- Sequence and interlock validation results
- Fault and edge case test records
- Documentation supporting site commissioning handover
Engagements are scoped to defined objectives with clear deliverables — not open-ended retainers.